Hotel Syracuse
Hotel Renovations | Syracuse, NY
PROJECT INFORMATION
MEP
351,000 SF
TEAM
IPD Engineering
MGL Architects
This 12-story historic hotel had gone through many bankruptcies and poorly executed renovations over the years. IPD’s team of engineers were hired to complete an assessment of all existing infrastructure. Upon completion our engineers, along with the design team, were hired to renovate this hotel from top to bottom. We designed all new state-of-the-art HVAC, electrical, plumbing and fire protection systems throughout the building. Some of the spaces we designed these systems for included several ball rooms, 350 hotel rooms, an IACC meeting center with IT and AN systems designed to stringent Marriott meeting space standards, lobby, multiple kitchens, several shops, back of house areas, mechanical/electrical infrastructure spaces and more. In total, the work IPD was responsible for designing had a construction value of over $20M and was within the budget set for our trades.